Project Descriptions

Ring Road Widening Project from Maryouteya corridor up to Sahari Al Haram , with the modification of Ring Road interchange with Cairo / Alexandria Desert Highway.

The project consists of three separate directions as follows:1- Direction (A) :{ the length of the concrete part is 973 m/L + length of soil reinforcement is 1062 m/L + length of Road works is 2500 m/L}, Total Lengths 4535 m/L. 2- Direction (C): { the length of the concrete part is 1858 m/L + length of soil reinforcement is 767 m/L + length of Road works is 2500 m/L+ length of the required expansion part through Cairo-Alexandria Desert road is 1025 m/L }., Total Lengths 6150 m/L.3- Al Lebeny Direction :{ length of the concrete part in the direction C is 118 m/L+ length of the concrete part at the Al Lebeny St. is 134 m/L}, Total Lengths 252 m/L.

Project Details

Client :Ministry of Housing, Utilities and New Urban Development - Central Org. for Construction - The Executive Org. for Construction of Greater Cairo.
Activity :Roads & Bridges
Location :Cairo Ring Road - Cairo Governorate
Finished in :Mar., 2009