Marsa Matrouh Sewage Plant
The project includes the following:
* First Stage:
• Gravity sewer lines of 73000 m.l of vitrified pipes with diam 7” to 24”.
• Force main pipes of 30000 m.l of G.R.P with dia. 250 to 500 mms.
• 4 Pump stations.
* Second Stage:
- Gravity sewer lines 37000 m.l of V.C. pipes with dia. 7” to 24”
- Force main pipes 30000 m.l of G.R.P with dia. 500 to 700 mm
- 4 Pump stations.
* Sewage Treatment plant , contains:
Oxidation ponds plant system of capacity 50000 to 100000 m3/day.
Major Quantities:
• Excavation 100000 m3
• Lining P.V.C. 280000 m2
• Flooring injection 310000 m2
Project Details
Client :The National Org. for potable water & Sanitary Drainage |
Activity :Utilities |
Location :Marsa Matrouh Governorate |
Finished in :July,2014 |