Project Descriptions

Marsa Matrouh Sewage Plant

The project includes the following: * First Stage: • Gravity sewer lines of 73000 m.l of vitrified pipes with diam 7” to 24”. • Force main pipes of 30000 m.l of G.R.P with dia. 250 to 500 mms. • 4 Pump stations. * Second Stage: - Gravity sewer lines 37000 m.l of V.C. pipes with dia. 7” to 24” - Force main pipes 30000 m.l of G.R.P with dia. 500 to 700 mm - 4 Pump stations. * Sewage Treatment plant , contains: Oxidation ponds plant system of capacity 50000 to 100000 m3/day. Major Quantities: • Excavation 100000 m3 • Lining P.V.C. 280000 m2 • Flooring injection 310000 m2

Project Details

Client :The National Org. for potable water & Sanitary Drainage
Activity :Utilities
Location :Marsa Matrouh Governorate
Finished in :July,2014